The Roads and Transport Authority (RTA) will open on Friday 7 August 2015 the final stage of Al Yalayes Road completing the link of Sheikh Mohammed bin Zayed Road (at Al Houdh R/A) with the Emirates Road via the Dubai Investment Park (DIP). This traffic corridor, which spans 4 lanes in each direction and stretches 9 km, also provides entry & exit points to the DIP, Jumeirah Golf Estates through signalized R/As which can later be transformed into flyovers. The project also included the construction of a ramp on the Emirates Road to ease the traffic flow inbound from Jebel Ali heading left towards Sharjah.
↧